Skip to main content

$35 million sought for new high school

The Menominee Indian School District held its first in-person forum March 17 to inform residents about the $35 million referendum that would build a new high school in Keshena. If voters approve the referendum April 5, then property owners could see an increase of $2.99 per $1,000 of equalized valuation over the next five years and then decrease to $2.87 after that. That means the owner of a $100,000 piece of property will see school taxes go up $299. The district plans to build the new school on a 40-acre wooded lot behind the Save-A-Lot grocery store. The new school would utilize Menominee preservation principles, with over 20 acres remaining as forest to provide outdoor learning. The school would also utilize geothermal and solar power to be energy efficient, and the school would be designed to include as much natural and healthy lighting as possible. Kate Mikel, assistant principal for Menominee Indian High School, noted that the image included with promotional materials does not show forest land but assured people at the meeting that there will be plenty of trees on the property. “It’s hard to put a heavily wooded area on a computer model,” Mikel said. Mikel noted that the new school will also house the district office. Currently, the offices are located at Keshena Primary School, but with the school district continuing to increase its population, the office space will be needed for other things with the elementary school. The district has 973 students this year. In the 2017-18 school year, the total student population was 887. That includes 88 students that come to the district from Shawano through the state’s open enrollment system, although officials noted that more than 100 students living in the Menominee Indian school boundaries attend schools off the reservation. Mikel noted that the high school is seeing each graduating class increase by 20, noting that this year’s freshman class has 110 students. The land on which the district hopes to build the high school is owned by the tribe, but the two entities have agreed to a land swap. In exchange, the tribe is getting the land and structure where Menominee Indian Middle School currently sits in Neopit, which could be used to house Menominee Tribal School currently in Neopit or for some other purpose. “To keep that enrollment in our school buildings, we know we’re going to have to need more space to keep the classroom sizes a good size for our students, as well as keeping the teacher-to-student ratio low,” Mikel said. “Research shows us that with a teacher with less pupils, students are more likely to succeed.” According to Kyla Jones, the district’s technology director, the existing middle school was built in 1980, and the current high school is even older. The problem with adding on to the middle school is that it’s land-locked, so there is nowhere to put an expanded wing. As a result of the land trade, the middle school would be moved to the existing high school facility. That school would also include fifth-grade students to give Keshena Primary some breathing room. Mikel noted that would ease district operations and cut out the costs of transportation, sending food and other necessities to Neopit more than 15 minutes away. “If we move the middle school to the current high schools, all three of the schools will be near the same campus,” Mikel said. “Once that move takes place, then we’re able to share a lot of resources that we’re not able to share right now.” Mikel noted that the middle and high schools would be able to share teachers, and there could be expanded programs, especially with career and technical education. College and dual-enrollment classes could also be expanded, as the district has partnerships with the College of Menominee Nation, Northeast Wisconsin Technical College and Northcentral Technical College. “A teacher might be able to teach a wood shop class at the high school in the morning and then be able to go to the middle school and offer that same class in the afternoon. Right now, we’re not able to easily share teachers,” Mikel said. “If our schools were all located in the same area, we would also be able to share substitutes. That would take a great burden off of all our buildings.” The district started looking at its future needs in 2020 and first examined what it would cost to renovate the existing schools, according to Jones. The total cost was estimated to be $29.5 million with high school renovations accounting for $14.5 million, almost half. Safety-wise, the new high school would more easily be able to go into lockdown mode, according to Mikel. “That’s one of our challenges right now with our older buildings,” Mikel said. “They were not created when we thought about school safety, and there are a lot of improvements that need to be done to them to be safe for our students and staff.” For the most part, athletic facilities like football and baseball fields are not planned for the new high school, as the district plans to utilize the existing outdoor facilities. Jones noted there would be a new field house planned for basketball, wrestling and other indoor sports that could house up to 1,500 spectators. “This would allow for more sporting events and more community events to happen within the school,” Jones said. lpulaski@newmedia-wi.com